Construction Scheduler
Company: Bristol Infrastructure Design Svcs, LLC
Location: Bossier City
Posted on: February 13, 2026
|
|
|
Job Description:
Job Description Job Description Bristol Infrastructure Design
Services LLC is hiring a Construction Scheduler to provide
professional support services to the Department of Navy in Area of
Responsibility (AOR). Major Responsibilities • Provides assistance
and technical guidance to engineers/architects exercising
construction oversight and design management of Capital
Improvements projects. • Routinely communicate and coordinate with
other technical and non technical NAVFAC personnel within the
Facilities Engineering Command. • Reviewing the scope of individual
projects and proposing reasonable construction durations. • Review
of Baseline Schedules and monthly contractor updates to determine
the validity and conformance to contract requirements. • Assist in
the validation of impacts to the approved construction schedule. •
Provide analysis on how the contractor can recover, if at all, from
current delays to meet the contract completion date. • Develop,
maintain, and provide scheduling training to each field office and
respective personnel covering the basic understanding of network
analysis schedules, critical path method, time impact analysis,
baseline, progress, and as-built schedule reviews, guide
specifications requirements, and software usage. • Provide guidance
and training to Design staff in the proper editing and use of the
scheduling guide specification for incorporation into contract
documents Minimum Education/Experience Engineering Degree,
associate's degree in construction management, Construction
Technology or Building Construction and a minimum of 5 years of
Construction Scheduling experience OR a High School Diploma and 10
years of Construction Scheduling experience. Required Knowledge or
Skills • A minimum of 7 years of construction scheduling experience
utilizing Primavera P6 or its earlier versions. • Experience in
preparing or analyzing Time-Impact-Analysis as it relates to time
extension requests or claims. • Ability to evaluate baseline
schedules and monthly updates. • Ability to manage multiple
priorities and, when requested, independently develop and provide
technical recommendations/ solutions regarding scheduling issues
and time impacts on complex problems encountered during the
administration of the construction contracts. Preferred Knowledge
or Skills • Registration as a Planning and Scheduling Professional
(PSP) is desirable. Physical Demands • Light physical workload. •
Required to have close visual acuity to perform activities such as
viewing a computer terminal and extensive reading. • Specific
physical requirements include, but are not limited to, climbing,
balancing, stooping, kneeling, reaching, walking, lifting,
grasping, talking, hearing, and performing repetitive motions. •
The worker is subject to both inside and outside environmental
conditions. Benefits Excellent salary and benefits package to
include: paid time off, paid holidays, comprehensive health
insurance plan including medical, dental, vision, life insurance,
long-term disability insurance; 401(k) plan with employer
match.
Keywords: Bristol Infrastructure Design Svcs, LLC, Longview , Construction Scheduler, Construction , Bossier City, Texas